8670 State Route 405, Milton, PA 17847
Bloomsburg carries more parking lot traffic than its size suggests. Between the shopping centers along Columbia Boulevard near the Interstate 80 interchange, the daily flow of students and staff around Bloomsburg University, and the businesses working to protect themselves along the Susquehanna River and Fishing Creek, a parking lot here has to hold up to heavy use and to water in ways that flatter, drier towns don’t have to plan for. Mike Young Paving provides parking lot paving in Bloomsburg, PA for retail centers, university-area properties, and commercial sites throughout Columbia County.
We’ve worked across central Pennsylvania since 1987, which means our crews already understand how a lot near the river behaves differently from one on higher ground, and how a retail lot off Columbia Boulevard needs a different repaving plan than a quieter lot downtown. That local knowledge shapes everything from how we grade a new lot to how we schedule resurfacing work around a business’s busiest hours.
Submit the form below and one of our estimators will get back to you shortly.
Two things wear down a Bloomsburg parking lot faster than in most nearby towns.
The first is ordinary Pennsylvania winter weather. Water gets into small surface cracks, freezes, expands, and widens the crack. Do that dozens of times each winter and a lot that looked fine in November can have real damage by spring, especially in low spots where meltwater sits instead of draining away.
The second is water from the river and creek system. Bloomsburg sits where the Susquehanna River and Fishing Creek come together, and parts of the Town have flooded repeatedly over the past century, most severely in 2011. A parking lot built or repaved in a flood-exposed area needs grading and drainage that move water off the surface quickly and direct it away from buildings, not just a smooth, level top coat. That’s a different design problem than a lot on higher, drier ground, and it’s one our crews plan for from the start rather than treating as an afterthought.
A parking lot is only as strong as what’s underneath it, and that matters more in a town where drainage is already a concern. Before any asphalt goes down, our crews compact the subgrade, the native soil the lot sits on, so it won’t shift or settle unevenly under vehicle weight. On sites with drainage challenges or softer soil, we may add a layer of crushed stone as a stable base and grade the whole surface with a slight slope so water sheds toward drains instead of pooling. Skipping or rushing this step is one of the most common reasons a “new” parking lot develops cracks and low spots within just a year or two.
Bloomsburg isn’t one uniform commercial district, and that shapes how we approach each project. A retail lot off Columbia Boulevard near the Interstate 80 interchange handles thousands of vehicle trips a day and needs pavement built for constant turning, braking, and delivery truck weight. A lot near Bloomsburg University sees lighter vehicles but sharper swings in use tied to the academic calendar, with heavy demand during the school year and quieter stretches in summer. And commercial properties closer to the river benefit from the Town’s floodwall and levee system, completed after the 2011 flood, but still need drainage design that accounts for the area’s flood history rather than assuming the levee removes all risk. We plan each project around which of these situations actually applies to the property.
One representative project involved a retail plaza near the Columbia Boulevard corridor where customers and staff had started avoiding a section of the lot that held standing water after every storm. Rather than just patching the visible cracks, our crew traced the problem back to a low spot with no clear path to the nearest drain. We milled out the affected section, rebuilt the base with proper grading toward the drain, and repaved and restriped the area. The fix addressed the drainage problem at its source instead of leaving it to resurface again after the next heavy rain.
Yes, in most cases. New parking lot construction and major resurfacing typically go through the Town’s zoning and stormwater review, and if the property sits in the mapped floodplain, a separate floodplain development permit is required as well. We confirm what applies to your specific property before work begins.
Most commercial lots benefit from sealcoating every two to three years, though lots that see heavier traffic, like those along Columbia Boulevard, or lots exposed to more standing water may need it sooner.
In many cases, yes. We can often phase the work in sections so part of the lot stays open, which matters for retail properties that can’t afford a full closure during business hours.
That depends on the property. If water already pools in certain spots, regrading or adding drainage is usually a better long-term fix than repaving over the same problem. We assess this during the site visit.
The basic freeze-thaw cycle is the same across central Pennsylvania, but Bloomsburg lots near the Susquehanna River or Fishing Creek also deal with periodic flood exposure, so drainage design carries more weight here than in towns without that flood history.
Milling removes and replaces the top layer of asphalt while keeping a sound base intact, which is often enough for a lot with surface wear but a stable foundation. Full replacement is usually needed when the base itself has failed or shifted.
Call Mike Young Paving at 570-742-0391 to schedule a site visit for parking lot paving, resurfacing, or repair anywhere in Bloomsburg and the surrounding Columbia County area.
Mike Young Paving, Inc. | 8670 State Route 405, Milton, PA 17847 | 570-742-0391
Submit the form below and one of our estimators will get back to you shortly.